燃?xì)獍l(fā)電機(jī)組的操作步驟有哪些?

返回 2024.06.24 來(lái)源:http://www.kan138.cn 0

一、燃?xì)獍l(fā)電機(jī)操作步驟

1、 Operating steps for gas generators

1、燃?xì)獍l(fā)電機(jī)開(kāi)機(jī)的準(zhǔn)備

1. Preparation for starting up a gas generator

1、)確認(rèn)各設(shè)備安裝正確、線路無(wú)誤、操作部分應(yīng)靈活、運(yùn)動(dòng)件不得有卡滯、元器件齊全可靠后方可準(zhǔn)備投入運(yùn)行。

1. Confirm that all equipment is installed correctly, the wiring is correct, the operating parts should be flexible, the moving parts should not be stuck, and the components are complete and reliable before preparing for operation.

2、)檢查各聯(lián)接緊固件應(yīng)安裝牢固、操作部分應(yīng)靈便。電纜接線不松動(dòng),蓄電池連接線正負(fù)極間隔距離應(yīng)大于l50mm,防止相碰而產(chǎn)生火花。

2. Check that all connecting fasteners are securely installed and that the operating parts are flexible. The cable wiring should not be loose, and the distance between the positive and negative poles of the battery connection line should be greater than 50mm to prevent sparks from colliding.

4、)所有電器開(kāi)關(guān)及調(diào)節(jié)旋鈕應(yīng)位于相應(yīng)停機(jī)位置。

4. All electrical switches and adjustment knobs should be located in the corresponding shutdown position.

5、)控制屏(箱)蓄電池及電子調(diào)速器電源開(kāi)關(guān)置“通”位,按試報(bào)警按鈕檢查各報(bào)警指示燈及聲音是否正常,如果發(fā)現(xiàn)指示燈不閃爍或無(wú)音響,應(yīng)進(jìn)行檢查或更換。檢查完畢按動(dòng)消音及報(bào)警解除按鈕,使各報(bào)警信號(hào)復(fù)原。

20230315052245106.jpg

5. Set the power switch of the control screen (box) battery and electronic speed controller to the "on" position, press the test alarm button to check whether each alarm indicator light and sound are normal. If the indicator light does not flash or there is no sound, it should be checked or replaced. After inspection, press the mute and alarm release buttons to restore all alarm signals.

6、)天然氣發(fā)動(dòng)機(jī)開(kāi)機(jī)前應(yīng)檢查潤(rùn)滑、冷卻、氣源、啟動(dòng)、操縱等系統(tǒng)的準(zhǔn)備工作。

6. Before starting a natural gas engine, the preparation work for lubrication, cooling, air supply, starting, and control systems should be checked.

2、開(kāi)機(jī)操作

2. Power on operation

操作時(shí),必須保證箱式變電站低壓進(jìn)線開(kāi)關(guān)處于斷開(kāi)位置,機(jī)組油、水、合上預(yù)供油開(kāi)關(guān),啟動(dòng)電動(dòng)預(yù)供油泵(或扳動(dòng)手搖機(jī)油泵)。待主油道壓力達(dá)100kPa啟動(dòng)要求值后,按下起動(dòng)按鈕“Start”,機(jī)組起動(dòng)后,可按下“翻頁(yè)"按鈕,通過(guò)液晶顯示屏檢查發(fā)動(dòng)機(jī)運(yùn)行中各項(xiàng)技術(shù)參數(shù)的變化。起動(dòng)成功后應(yīng)怠速暖機(jī),當(dāng)機(jī)油溫、水溫達(dá)到40℃以上,方可加速、加載。

During operation, it is necessary to ensure that the low-voltage incoming switch of the box type substation is in the off position, and the oil and water supply switches of the unit are closed. Start the electric pre supply oil pump (or pull the hand operated oil pump). After the main oil duct pressure reaches the required starting value of 100kPa, press the "Start" button. After the unit starts, press the "Page" button to check the changes in various technical parameters during engine operation through the LCD screen. After successful starting, the engine should be idling and warmed up. When the oil and water temperatures reach 40 ℃ or above, acceleration and loading can be carried out.

3.停機(jī)

3. Shutdown

發(fā)動(dòng)機(jī)的停機(jī)操作一般在主開(kāi)關(guān)已經(jīng)分閘后進(jìn)行。無(wú)論在就地、遠(yuǎn)方還是自動(dòng)進(jìn)行操作,基本的過(guò)程都是一樣的。當(dāng)外電恢復(fù)正常時(shí),可通過(guò)站控室“配電盤(pán)”監(jiān)測(cè)到外電電能狀況,在發(fā)電機(jī)停止送電的情況下,依次合上箱式變電站內(nèi)低壓側(cè)進(jìn)線斷路器即可恢復(fù)市電供電。

The engine shutdown operation is usually carried out after the main switch has been opened. The basic process is the same whether operating on-site, remotely, or automatically. When the external power is restored to normal, the external power status can be monitored through the "distribution panel" in the station control room. When the generator stops supplying power, the low-voltage side incoming circuit breaker in the box type substation can be closed in sequence to restore the mains power supply.

停機(jī)后將電氣開(kāi)關(guān)全部放在停機(jī)位置上,各調(diào)節(jié)旋鈕亦復(fù)原到停機(jī)的相應(yīng)位置,以便下次起動(dòng)。

After shutdown, place all electrical switches in the shutdown position, and restore all adjustment knobs to the corresponding shutdown positions for the next startup.

4.維護(hù)保養(yǎng)

4. Maintenance and upkeep

機(jī)組正常發(fā)電后,應(yīng)對(duì)天然氣機(jī)、發(fā)電機(jī)、控制屏等進(jìn)行監(jiān)視并定時(shí)做好運(yùn)行狀況記錄,隨時(shí)注意電壓、頻率、功率及天然氣發(fā)動(dòng)機(jī)

After the normal power generation of the unit, the natural gas engine, generator, control panel, etc. should be monitored and the operating status should be recorded regularly. Attention should be paid to voltage, frequency, power, and natural gas engine at all times

本文由沼氣發(fā)電機(jī)組友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊: http://www.kan138.cn真誠(chéng)的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

This article is a friendly contribution from biogas generators. For more related knowledge, please click: http://www.kan138.cn Sincere attitude. We will provide you with comprehensive service. We will gradually contribute more relevant knowledge to everyone. Stay tuned

新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

燃?xì)獍l(fā)電機(jī)組的操作步驟有哪些?

一、燃?xì)獍l(fā)電機(jī)操作步驟

1、 Operating steps for gas generators

1、燃?xì)獍l(fā)電機(jī)開(kāi)機(jī)的準(zhǔn)備

1. Preparation for starting up a gas generator

1、)確認(rèn)各設(shè)備安裝正確、線路無(wú)誤、操作部分應(yīng)靈活、運(yùn)動(dòng)件不得有卡滯、元器件齊全可靠后方可準(zhǔn)備投入運(yùn)行。

1. Confirm that all equipment is installed correctly, the wiring is correct, the operating parts should be flexible, the moving parts should not be stuck, and the components are complete and reliable before preparing for operation.

2、)檢查各聯(lián)接緊固件應(yīng)安裝牢固、操作部分應(yīng)靈便。電纜接線不松動(dòng),蓄電池連接線正負(fù)極間隔距離應(yīng)大于l50mm,防止相碰而產(chǎn)生火花。

2. Check that all connecting fasteners are securely installed and that the operating parts are flexible. The cable wiring should not be loose, and the distance between the positive and negative poles of the battery connection line should be greater than 50mm to prevent sparks from colliding.

4、)所有電器開(kāi)關(guān)及調(diào)節(jié)旋鈕應(yīng)位于相應(yīng)停機(jī)位置。

4. All electrical switches and adjustment knobs should be located in the corresponding shutdown position.

5、)控制屏(箱)蓄電池及電子調(diào)速器電源開(kāi)關(guān)置“通”位,按試報(bào)警按鈕檢查各報(bào)警指示燈及聲音是否正常,如果發(fā)現(xiàn)指示燈不閃爍或無(wú)音響,應(yīng)進(jìn)行檢查或更換。檢查完畢按動(dòng)消音及報(bào)警解除按鈕,使各報(bào)警信號(hào)復(fù)原。

20230315052245106.jpg

5. Set the power switch of the control screen (box) battery and electronic speed controller to the "on" position, press the test alarm button to check whether each alarm indicator light and sound are normal. If the indicator light does not flash or there is no sound, it should be checked or replaced. After inspection, press the mute and alarm release buttons to restore all alarm signals.

6、)天然氣發(fā)動(dòng)機(jī)開(kāi)機(jī)前應(yīng)檢查潤(rùn)滑、冷卻、氣源、啟動(dòng)、操縱等系統(tǒng)的準(zhǔn)備工作。

6. Before starting a natural gas engine, the preparation work for lubrication, cooling, air supply, starting, and control systems should be checked.

2、開(kāi)機(jī)操作

2. Power on operation

操作時(shí),必須保證箱式變電站低壓進(jìn)線開(kāi)關(guān)處于斷開(kāi)位置,機(jī)組油、水、合上預(yù)供油開(kāi)關(guān),啟動(dòng)電動(dòng)預(yù)供油泵(或扳動(dòng)手搖機(jī)油泵)。待主油道壓力達(dá)100kPa啟動(dòng)要求值后,按下起動(dòng)按鈕“Start”,機(jī)組起動(dòng)后,可按下“翻頁(yè)"按鈕,通過(guò)液晶顯示屏檢查發(fā)動(dòng)機(jī)運(yùn)行中各項(xiàng)技術(shù)參數(shù)的變化。起動(dòng)成功后應(yīng)怠速暖機(jī),當(dāng)機(jī)油溫、水溫達(dá)到40℃以上,方可加速、加載。

During operation, it is necessary to ensure that the low-voltage incoming switch of the box type substation is in the off position, and the oil and water supply switches of the unit are closed. Start the electric pre supply oil pump (or pull the hand operated oil pump). After the main oil duct pressure reaches the required starting value of 100kPa, press the "Start" button. After the unit starts, press the "Page" button to check the changes in various technical parameters during engine operation through the LCD screen. After successful starting, the engine should be idling and warmed up. When the oil and water temperatures reach 40 ℃ or above, acceleration and loading can be carried out.

3.停機(jī)

3. Shutdown

發(fā)動(dòng)機(jī)的停機(jī)操作一般在主開(kāi)關(guān)已經(jīng)分閘后進(jìn)行。無(wú)論在就地、遠(yuǎn)方還是自動(dòng)進(jìn)行操作,基本的過(guò)程都是一樣的。當(dāng)外電恢復(fù)正常時(shí),可通過(guò)站控室“配電盤(pán)”監(jiān)測(cè)到外電電能狀況,在發(fā)電機(jī)停止送電的情況下,依次合上箱式變電站內(nèi)低壓側(cè)進(jìn)線斷路器即可恢復(fù)市電供電。

The engine shutdown operation is usually carried out after the main switch has been opened. The basic process is the same whether operating on-site, remotely, or automatically. When the external power is restored to normal, the external power status can be monitored through the "distribution panel" in the station control room. When the generator stops supplying power, the low-voltage side incoming circuit breaker in the box type substation can be closed in sequence to restore the mains power supply.

停機(jī)后將電氣開(kāi)關(guān)全部放在停機(jī)位置上,各調(diào)節(jié)旋鈕亦復(fù)原到停機(jī)的相應(yīng)位置,以便下次起動(dòng)。

After shutdown, place all electrical switches in the shutdown position, and restore all adjustment knobs to the corresponding shutdown positions for the next startup.

4.維護(hù)保養(yǎng)

4. Maintenance and upkeep

機(jī)組正常發(fā)電后,應(yīng)對(duì)天然氣機(jī)、發(fā)電機(jī)、控制屏等進(jìn)行監(jiān)視并定時(shí)做好運(yùn)行狀況記錄,隨時(shí)注意電壓、頻率、功率及天然氣發(fā)動(dòng)機(jī)

After the normal power generation of the unit, the natural gas engine, generator, control panel, etc. should be monitored and the operating status should be recorded regularly. Attention should be paid to voltage, frequency, power, and natural gas engine at all times

本文由沼氣發(fā)電機(jī)組友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊: http://www.kan138.cn真誠(chéng)的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.