日韩美亚洲快播电影网一区二区三区,99久久人妻精品免费一区四季,亚洲国产成人手机版,夜夜操狠狠操天天摸

歡迎進(jìn)入濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司官網(wǎng)!
當(dāng)前位置:首頁(yè) - 新聞中心 - 行業(yè)資訊

行業(yè)資訊

柴油發(fā)電機(jī)組怎么接電線以及注意事項(xiàng)

返回 2024.07.02 來(lái)源:http://www.kan138.cn 0

柴油發(fā)電機(jī)實(shí)質(zhì)是一臺(tái)三次諧波自勵(lì)磁凸極式三相四線同步發(fā)電機(jī),因具有輸出功率大、適合移動(dòng)等優(yōu)點(diǎn),故廣泛用于廠礦、工程施工等場(chǎng)合。雖然功率不同的發(fā)電機(jī),其繞組數(shù)據(jù)有所不同,但電路連接基本相同:

The diesel generator is essentially a third-order harmonic self-excited salient pole three-phase four wire synchronous generator, which is widely used in factories, mines, engineering construction and other occasions due to its advantages of high output power and suitability for movement. Although the winding data of generators with different powers may vary, the circuit connections are basically the same:

接線過(guò)程:柴油發(fā)電機(jī)出來(lái)的四根線。其中一根是N標(biāo)記的線是零線。別的三根為火線。三相負(fù)載平衡。簡(jiǎn)單的一點(diǎn)說(shuō)就是發(fā)電機(jī)是15KW現(xiàn)在帶了一臺(tái)5KW的三相電動(dòng)機(jī)。

Wiring process: Four wires from the diesel generator. One of the lines marked with N is the zero line. The other three are live wires. Three phase load balancing. Simply put, the generator is 15KW and now comes with a 5KW three-phase motor.

假如說(shuō)想再接一臺(tái)2KW的單相電機(jī)的話很有可能造成三相不平衡。如果想單獨(dú)接單相電用的話可以三根火線中隨便拉一根當(dāng)作火線。再接一根零線可以當(dāng)作單相電用。要是想單獨(dú)接一相出來(lái)用也可以。不過(guò)功率是不能太大的設(shè)備。那樣容易造成三相不平衡。另外三相柴油發(fā)電機(jī)還得看多少KW的發(fā)電機(jī)。小的發(fā)電機(jī)見(jiàn)意接三相電后。可以接一些照明什么的。不主張?jiān)俳庸β蚀蟮碾娖鳌?/p>

If you want to connect another 2KW single-phase motor, it is very likely to cause three-phase imbalance. If you want to connect single-phase electricity separately, you can pull any one of the three live wires as a live wire. Connecting another neutral wire can be used as single-phase electricity. If you want to connect one phase separately, you can also use it. However, the power cannot be too high for devices. That can easily cause three-phase imbalance. In addition, it depends on how many KW generators there are for three-phase diesel generators. The small generator is connected to three-phase electricity. Can you provide some lighting or something. We do not advocate connecting high-power electrical appliances again.

接線注意事項(xiàng):柴油發(fā)電機(jī)組接線時(shí)要注意以下幾點(diǎn):

Wiring precautions: When wiring diesel generator sets, pay attention to the following points:

1、接地線接線點(diǎn)一般是在柴油發(fā)電機(jī)組的底盤(pán)末端,在安裝接地線時(shí),必須接到合適的地線位置。

1. The grounding wire connection point is generally located at the end of the chassis of the diesel generator set. When installing the grounding wire, it must be connected to the appropriate grounding wire position.

2、交流發(fā)電機(jī)接地中線的連接通常由用戶安裝時(shí)決定,當(dāng)柴油發(fā)電機(jī)組作為唯一電源時(shí),中線必須直接連到工廠接地線上。

2. The connection of the grounding neutral of the AC generator is usually determined by the user during installation. When the diesel generator set is used as the sole power source, the neutral must be directly connected to the factory grounding wire.

山西11MW

3、較為復(fù)雜的安裝,應(yīng)選擇接地中點(diǎn)以確保柴油發(fā)電機(jī)組正確的運(yùn)行或保護(hù)設(shè)備,例如發(fā)現(xiàn)接地故障和將接地循環(huán)電流降到最小。

3. For more complex installations, the grounding midpoint should be selected to ensure the correct operation or protection of the diesel generator set, such as detecting grounding faults and minimizing the grounding circulating current.

4、接地線必須根據(jù)用戶和地方當(dāng)局的建議來(lái)安排。

4. The grounding wire must be arranged according to the suggestions of the user and local authorities.

5、保證設(shè)備接線一直得到有效的維持,關(guān)于接線系統(tǒng)的維護(hù)應(yīng)嚴(yán)格按照說(shuō)明書(shū)去做。

5. Ensure that the equipment wiring is always effectively maintained, and the maintenance of the wiring system should be strictly carried out in accordance with the instructions.

柴油電機(jī)組要做到精確接線,首先應(yīng)辨別接線柱或引出線是相線仍是零線。通常情況下,發(fā)電機(jī)的各接線柱或引出線都用必然的標(biāo)記來(lái)區(qū)別是相線仍是零線。只要加以重視就可進(jìn)行辨別零線接線柱常常使用字母M或O作標(biāo)記,也有在接線旁標(biāo)以接地符號(hào)標(biāo)示的。

To achieve precise wiring of diesel generator sets, the first step is to distinguish whether the terminal or outgoing line is a phase line or a zero line. Usually, the terminals or leads of a generator are marked with necessary markings to distinguish whether it is a phase line or a neutral line. As long as it is taken seriously, it can be distinguished that the zero wire terminal is often marked with the letters M or O, and there are also grounding symbols marked next to the wiring.

如果零線接線柱上無(wú)符號(hào)或符號(hào)恍惚不清,可在發(fā)電機(jī)運(yùn)行歷程中用電壓表測(cè)試鑒定,不要采用“碰火”的操作。

If there is no symbol on the zero wire terminal or the symbol is unclear, a voltmeter can be used to test and identify it during the operation of the generator, and the operation of "touching fire" should not be used.

本文由燃?xì)獍l(fā)電機(jī)組友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊:http://www.kan138.cn 真誠(chéng)的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

This article is dedicated to the friendship of gas generators. For more information, please click: http://www.kan138.cn Sincere attitude. We will provide you with comprehensive service. We will gradually contribute more relevant knowledge to everyone. Stay tuned

新聞搜索
濟(jì)南濟(jì)柴環(huán)能燃?xì)獍l(fā)電設(shè)備有限公司
  • 服務(wù)熱線

    0531-62325028
    0531-69951266

柴油發(fā)電機(jī)組怎么接電線以及注意事項(xiàng)

柴油發(fā)電機(jī)實(shí)質(zhì)是一臺(tái)三次諧波自勵(lì)磁凸極式三相四線同步發(fā)電機(jī),因具有輸出功率大、適合移動(dòng)等優(yōu)點(diǎn),故廣泛用于廠礦、工程施工等場(chǎng)合。雖然功率不同的發(fā)電機(jī),其繞組數(shù)據(jù)有所不同,但電路連接基本相同:

The diesel generator is essentially a third-order harmonic self-excited salient pole three-phase four wire synchronous generator, which is widely used in factories, mines, engineering construction and other occasions due to its advantages of high output power and suitability for movement. Although the winding data of generators with different powers may vary, the circuit connections are basically the same:

接線過(guò)程:柴油發(fā)電機(jī)出來(lái)的四根線。其中一根是N標(biāo)記的線是零線。別的三根為火線。三相負(fù)載平衡。簡(jiǎn)單的一點(diǎn)說(shuō)就是發(fā)電機(jī)是15KW現(xiàn)在帶了一臺(tái)5KW的三相電動(dòng)機(jī)。

Wiring process: Four wires from the diesel generator. One of the lines marked with N is the zero line. The other three are live wires. Three phase load balancing. Simply put, the generator is 15KW and now comes with a 5KW three-phase motor.

假如說(shuō)想再接一臺(tái)2KW的單相電機(jī)的話很有可能造成三相不平衡。如果想單獨(dú)接單相電用的話可以三根火線中隨便拉一根當(dāng)作火線。再接一根零線可以當(dāng)作單相電用。要是想單獨(dú)接一相出來(lái)用也可以。不過(guò)功率是不能太大的設(shè)備。那樣容易造成三相不平衡。另外三相柴油發(fā)電機(jī)還得看多少KW的發(fā)電機(jī)。小的發(fā)電機(jī)見(jiàn)意接三相電后。可以接一些照明什么的。不主張?jiān)俳庸β蚀蟮碾娖鳌?/p>

If you want to connect another 2KW single-phase motor, it is very likely to cause three-phase imbalance. If you want to connect single-phase electricity separately, you can pull any one of the three live wires as a live wire. Connecting another neutral wire can be used as single-phase electricity. If you want to connect one phase separately, you can also use it. However, the power cannot be too high for devices. That can easily cause three-phase imbalance. In addition, it depends on how many KW generators there are for three-phase diesel generators. The small generator is connected to three-phase electricity. Can you provide some lighting or something. We do not advocate connecting high-power electrical appliances again.

接線注意事項(xiàng):柴油發(fā)電機(jī)組接線時(shí)要注意以下幾點(diǎn):

Wiring precautions: When wiring diesel generator sets, pay attention to the following points:

1、接地線接線點(diǎn)一般是在柴油發(fā)電機(jī)組的底盤(pán)末端,在安裝接地線時(shí),必須接到合適的地線位置。

1. The grounding wire connection point is generally located at the end of the chassis of the diesel generator set. When installing the grounding wire, it must be connected to the appropriate grounding wire position.

2、交流發(fā)電機(jī)接地中線的連接通常由用戶安裝時(shí)決定,當(dāng)柴油發(fā)電機(jī)組作為唯一電源時(shí),中線必須直接連到工廠接地線上。

2. The connection of the grounding neutral of the AC generator is usually determined by the user during installation. When the diesel generator set is used as the sole power source, the neutral must be directly connected to the factory grounding wire.

山西11MW

3、較為復(fù)雜的安裝,應(yīng)選擇接地中點(diǎn)以確保柴油發(fā)電機(jī)組正確的運(yùn)行或保護(hù)設(shè)備,例如發(fā)現(xiàn)接地故障和將接地循環(huán)電流降到最小。

3. For more complex installations, the grounding midpoint should be selected to ensure the correct operation or protection of the diesel generator set, such as detecting grounding faults and minimizing the grounding circulating current.

4、接地線必須根據(jù)用戶和地方當(dāng)局的建議來(lái)安排。

4. The grounding wire must be arranged according to the suggestions of the user and local authorities.

5、保證設(shè)備接線一直得到有效的維持,關(guān)于接線系統(tǒng)的維護(hù)應(yīng)嚴(yán)格按照說(shuō)明書(shū)去做。

5. Ensure that the equipment wiring is always effectively maintained, and the maintenance of the wiring system should be strictly carried out in accordance with the instructions.

柴油電機(jī)組要做到精確接線,首先應(yīng)辨別接線柱或引出線是相線仍是零線。通常情況下,發(fā)電機(jī)的各接線柱或引出線都用必然的標(biāo)記來(lái)區(qū)別是相線仍是零線。只要加以重視就可進(jìn)行辨別零線接線柱常常使用字母M或O作標(biāo)記,也有在接線旁標(biāo)以接地符號(hào)標(biāo)示的。

To achieve precise wiring of diesel generator sets, the first step is to distinguish whether the terminal or outgoing line is a phase line or a zero line. Usually, the terminals or leads of a generator are marked with necessary markings to distinguish whether it is a phase line or a neutral line. As long as it is taken seriously, it can be distinguished that the zero wire terminal is often marked with the letters M or O, and there are also grounding symbols marked next to the wiring.

如果零線接線柱上無(wú)符號(hào)或符號(hào)恍惚不清,可在發(fā)電機(jī)運(yùn)行歷程中用電壓表測(cè)試鑒定,不要采用“碰火”的操作。

If there is no symbol on the zero wire terminal or the symbol is unclear, a voltmeter can be used to test and identify it during the operation of the generator, and the operation of "touching fire" should not be used.

本文由燃?xì)獍l(fā)電機(jī)組友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊:http://www.kan138.cn 真誠(chéng)的態(tài)度.為您提供為全面的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

This article is dedicated to the friendship of gas generators. For more information, please click: http://www.kan138.cn Sincere attitude. We will provide you with comprehensive service. We will gradually contribute more relevant knowledge to everyone. Stay tuned

扶绥县| 东乌珠穆沁旗| 囊谦县| 昌都县| 石楼县| 沙洋县| 遵义市| 门源| 信丰县| 象州县| 宁城县| 和林格尔县| 宁国市| 莱阳市| 绿春县| 临西县| 中牟县| 固原市| 珲春市| 鹤山市| 公安县| 武平县| 巴中市| 内黄县| 临邑县| 古浪县| 襄城县| 雷波县| 泌阳县| 临海市| 峨边| 天气| 齐河县| 凉山| 罗平县| 玉屏| 乐昌市| 邯郸县| 景洪市| 平罗县| 田东县|